PEP ARAB Control Systems
Academy
← All projects

Red Sea Ports — 6 Tug Boats SCADA

SCADA for six tug boats (25th January, Eltobgy, Tahia Masr 1&2, Safaga 1&2) for the Red Sea Ports Authority.

A fleet of tug boats required consistent shipboard SCADA across multiple vessels with class-grade reliability.

Delivered across the fleet and acknowledged by the Authority (2023).

Have a similar requirement?

Request a quote →