PLACEHOLDER · REAL PHOTO REQUIRED
Triumph Shipping — BWT Control Panel
Ballast water treatment control panel built, wired and loop-tested — Desmi-accepted, DNV GL supervised.
View project →The challenge
A training ship required a marine data-acquisition and SCADA system with alarm, trend and reporting databases under class approval.
Result
Delivered under Bureau Veritas approval and acknowledged by the Arab Academy (2016).