PEP ARAB Control Systems
Academy
← All projects

TouatGaz — Gas Treatment Plant, Algeria

Redundant PEP-SMART II PLC for four packages, communicating with the Schneider DCS. 4.5 billion m³/year.

Four process packages had to be commissioned and integrated with a Schneider DCS, with full FAT, SAT and OTP.

TouatGaz — PEP-SMART II PLC architectureFour gas-treatment process packages feed a redundant PEP-SMART II PLC (controller A and B in hot standby), which communicates over Modbus with the plant Schneider DCS for Tecnicas Reunidas.Package 1Package 2Package 3Package 4PEP-SMART II · APEP-SMART II · BSchneider DCSTecnicas R.

Established communication between the four packages and the Schneider DCS (client letter, 2020).

Have a similar requirement?

Request a quote →